Thursday, January 14, 2016

Busy dojo, future of Beta Fish.



Thursday the 15th of January 2016 was a busy night at the Dojo in Athens Ohio.  In some exciting news, however, a new venue is on the horizon.  Beta Fish!


The first stage of Beta Fish will include a 40 degree wall with a headwall and dual, blunt, overhanging aretes.  To the left is a 20 degree wall connected to the left arete through a series of small angular panels.  To the left of the 20 degree wall is a vert and slab wall at 90 degrees from the main walls.  So psyched to work with Bryant on this exciting project!